SENTINEL Simulation equipment
  • Home
  • Videos
  • Inflation and inspection before packing

Inflation and inspection before packing

In the production hall every decoy is inflated to full volume, measured against the drawing and inspected seam by seam before it is folded and crated.

2 September 2026 Vertical 9:16

Inflation and inspection before packing

This clip has not been published yet. Contact us to request the full footage.

Request the footage

WHAT THE CLIP SHOWS

Every system is inflated before it is packed

This is the least glamorous footage we have, and the most useful. In the production hall a finished decoy is inflated to full volume on the floor, held at working pressure while it is measured against the drawing, and inspected seam by seam — valve seats, weld lines, and the printed detail that has to line up with the platform.

Only then is it deflated, folded to the packing plan and crated. The clip is vertical and unedited because that is how the inspection happens: one person, one torch, one decoy at a time.

WHY WE DO IT TWICE

A decoy that fails in the field cannot be replaced overnight

A container shipped to another continent is expensive to return. If a seam lets go on the third inflation, the customer has a decoy field with a hole in it and a repair argument instead of a replacement. Inflating and measuring in the hall catches what a folded inspection cannot see: a weld that holds at low pressure and creeps at working pressure, a valve that seats only when new, a panel that is five centimetres short once the shape is up.

Each unit carries the record of that inspection — pressure held, dimensions measured, the name of the person who signed it off — because the buyer of the twentieth decoy deserves the same evidence as the buyer of the first.

WHAT LEAVES WITH IT

The crate is the system

Every system ships as a set rather than a bag: the decoy, the blower matched to its volume, the anchoring kit, repair patches and adhesive, and the packing plan that tells a crew how to get it back into the bag the same way it came out.

Spares are quoted at the same time as the first order, because the parts that wear — valves, blower seals, anchor plates — wear at a rate we already know from units in service. Consumables are deliberately standard, so a unit can reorder without matching a serial number.

Want to see a specific test or drill?

Tell us the question and we will film the answer.