SENTINEL Simulation equipment

Inflatable hangars, shelters & tents

Inflatable hangars, warehouses and field shelters — from 5 m field tents to 60 m clear-span halls, PLC-controlled air pressure, anchored without foundations.

40 m inflatable mobile hangar

40 m inflatable mobile hangar

A 40-metre clear-span inflatable hangar for aircraft, vehicles or bulk storage, erected on site without a permanent foundation.

Emergency support base shelter

Emergency support base shelter

Dome-type camouflage shelter used as an emergency support base or field hospital, with a radar-absorbing skin that hides its contents.

Temporary warehouse shelter

Temporary warehouse shelter

Long-span inflatable warehouse for rapid logistics build-up, supplied with a storage container for the inflation and control equipment.

Integrated mobile space system

Integrated mobile space system

Multiple inflatable modules joined into one integrated space, used for large maintenance halls or combined storage and workspace.

Medical and rescue tent

Medical and rescue tent

Inflatable medical shelter supplied in negative-pressure, field-hospital and relief variants, with options for filtered air and medical gas ports.

Overview

The hangars and shelters in this family are engineered as structural inflatables rather than tents: high-strength composite fabric, high-frequency welded seams and a PLC pressure-control system that maintains internal pressure automatically and raises a low-pressure alarm. Systems are delivered with wind anchoring, ventilation and lighting options already integrated.

Frequently asked questions

What is an inflatable hangar used for?

A prefabricated clear-span shelter that gives aircraft, vehicles or stores a weatherproof home without a permanent building. It is erected on prepared ground or on a concrete pad, and can be struck and moved when the airfield moves.

How long does erection take?

About 8 hours for a complete structure with its services connected, using the site team and the supplied equipment — a fraction of the time a steel-framed building would take.

How large can it be?

Up to a 40 m clear span with no internal columns, giving several thousand square metres of uninterrupted floor. Length is extended in modules, so the shelter can grow with the requirement.

What climate can it withstand?

The envelope is rated for −30 °C to +60 °C with a PU waterproof and UV-stable coating, and the structure is rated for the same wind and snow loads as a comparable permanent shelter. Options cover anti-static and explosion-proof finishes, temperature control, and an arctic fuel-fired heating system for extreme cold.

Can it be used in a coastal or salt environment?

Yes. A corrosion-resistant coating is available for island and coastal sites, and the same structure is used for aircraft maintenance and for emergency storage.

Which aircraft will it house?

Fighter aircraft, helicopters and UAVs can all be sheltered, and the clear span means an aircraft can be towed in and out without shunting. Internal partitions can separate maintenance bays, stores and accommodation.

Is it a permanent building for planning purposes?

No. It is a relocatable structure on a prepared foundation, which is normally the point — it can be deployed in months rather than years and moved when the requirement changes.

What is included

  • Envelope with door and ventilation panels
  • Structural frame and inflation blower system
  • Anchor and ballast set for the site ground conditions
  • Lighting and power distribution kit (optional)
  • Internal partition modules (optional)
  • Erection tooling and spares kit
  • Erection and maintenance manual

Deployment

01

Prepare the site

Level and compact the footprint or pour the pad, and confirm access for the largest aircraft to be sheltered.

02

Set out the anchor line

Mark the perimeter and install anchors or ballast to the site wind loading.

03

Assemble the frame and envelope

Lay out the envelope, connect the frame modules and inflate the structure into shape.

04

Secure and tension

Connect the anchors and tension the envelope so the structure takes its design load.

05

Install services

Fit doors, ventilation, lighting and power distribution, and any internal partitions.

06

Commission

Pressure-test, check doors and ventilation, and hand over with the maintenance schedule.

07

Relocate when required

Deflate, pack and move the structure as a module set to the next site.

Ordering and delivery

Minimum orderFrom 1 set — mixed models can share one container
Sample lead time72 hours for stock patterns
DocumentationBid documents, test reports and certificate of origin
CustomisationCamouflage, unit markings, insignia and signature options
Service lifeOver 200 inflation cycles in field conditions
Lead time & paymentLead time and payment terms confirmed on enquiry

Swipe to see more →

Tell us the platforms you need to simulate and we will confirm specification, lead time and payment terms in writing.

Need a configuration for a specific platform?

Send the platform type, the signature you need and the delivery country — any platform, from any origin. You get back a written specification, a lead time and an export quotation.