SENTINEL Simulation equipment

Blog

Deception engineering notes

Technical articles on inflatable decoys, signature management, mobile hangars and aerostats — written for procurement and engineering teams.

EDITORIAL LINE

Written by the people who build the decoys

Every note here starts from a question a buyer actually asked — in a tender clarification, a factory acceptance test or a WhatsApp thread at 11 pm before a site visit. We write the answer down once, so the next buyer does not have to ask it again.

That is also why there are five articles and not fifty. A thin page repeating the catalogue adds nothing to a procurement decision, and we would rather leave the index short than pad it.

WHAT YOU WILL FIND

Four subjects, one standard of evidence

The notes fall into four groups: how decoys are detected and what defeats each sensor; how a specific figure in the specification is measured; how a deployment is planned on the ground; and how a category of equipment compares with the alternative a buyer is already considering.

  • Detection and defeat — radar cross-section, thermal signature, optical silhouette and how they are assessed together.
  • Specification practice — which numbers mean something in a tender, and which are marketing.
  • Deployment — crew size, ground conditions, inflation time, repacking and storage between uses.
  • Comparison — decoy against the live asset, aerostat against UAV, inflatable structure against containerised shelter.

Where a figure is not measured yet, the article says so instead of estimating. If you need a number for a specific platform, send the platform and we will measure it and quote against the measurement.